获取报价

立即获取免费报价

消息

铁矿石乐观情绪受成本上升和脱碳现实的影响

June 20

A primary focus of market sentiment this week emerged from the Singapore Green Steel Forum and Brussels panel presentations. Data presented by global monitoring bodies highlighted a profound economic barrier to rapid decarbonization. While traditional Blast Furnace-Basic Oxygen Furnace (BF-BOF) production methods hover at an operational baseline of approximately$400 per ton, transitioning to premium green steel utilizing renewable hydrogen and clean electricity spikes production costs to between$500 and $850 per ton, depending on regional energy access.

With total global investment in green steel production currently standing at a modest $20 billion, projected low-carbon capacity is expected to reach only 70.8 million tons by 2030—accounting for less than 4% of total anticipated global output.Analysts emphasize that until uniform global standards are established and frameworks like the European Union’s Carbon Border Adjustment Mechanism (CBAM) expand further, a multi-tiered pricing structure will remain firmly embedded in the global market.

联系我们

postmaster@sinoleopard.com
  • 上海松江区四川路351号3栋8层。
  • 请求查询

    请求查询

    接触